Making Progress Again

| | Comments (4) | TrackBacks (0)

Bev and I went to the mountains yesterday, March 13th.  We ate lunch with Randy and Sandy and then later stopped by to see Jennette and Jerry.  Things have been progressing very slowly over the winter. The weather has been the worst anyone can remember with constant rain and snow.  With the construction traffic the road has disintegrated and made it difficult to get in and out..  We're going to have to do a signifcant amount of work on it.  The road is already over budget, but we have no choice.  We have to fix it.  Another part of the delays resulted from Tim Carico, one of the builders, falling off our roof. We didn't know about it and only found out after he was laid up for around four weeks.  He said he didn't want to worry us.  He's back to work now although not fully healed.   Anyway, the major areas of progress we saw were the back porch roof over the deck, the chimney and the rock on the chimney, the upstairs floor, the tile floors in the laundry room and baths, the primer painting and a finish coat in one room, and about eight feet high pine boards in the great room.  The tile floors haven't been grouted and the stone on the chimney hasn't all been grouted either.  Enjoy the pictures.  The last picture shows the stream flowing more than usual. 

IMG_9181.JPG

IMG_9178.JPG

IMG_9182.JPG

IMG_9166.JPG

IMG_9164.JPG

IMG_9165.JPG

IMG_9170.JPG

IMG_9172.JPG

IMG_9171.JPG

IMG_9174.JPG

IMG_9175.jpg

IMG_9176.JPG

 

IMG_9177.JPG IMG_9211.JPG

IMG_9198.JPG

 

4 Comments

Ross and Kristy said:

Looks great!!!!!!!!!!!!! We are smiling along with you. Love you!

Elizabeth said:

Awesome! It's really coming along. How exciting!

Joel Caryl said:

If you live in a winter season area, I'm sure you have wondered how to defend you and your house against the harsh season. The solution is snow breaks. These will prevent costly damages to your roof and surounding property, icy side walks and entrances, and retain snow to serve as a insulation for the seasons costly heating bill.

function said:

Here, I have affreux out a step-by-action plan that not only presents you the required guides, guidelines and tips, but also reveals the required instruments and assets which you really should think about in your enterprise.

Leave a comment

0 TrackBacks

Listed below are links to blogs that reference this entry: Making Progress Again.

TrackBack URL for this entry: http://www.thetravisfam.com/cgi-bin/mt/mt-tb.cgi/611

Calendar

March 2012
Sun Mon Tue Wed Thu Fri Sat
        1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30 31



Recent Comments

About this Entry

This page contains a single entry by Larry published on March 14, 2010 2:24 PM.

Find recent content on the main index or look in the archives to find all content.

Meta Links